MAJOR PROJECTS

On-Going Projects:

• Telenor Pakistan MS Project: Via ZTE Pakistan for Central-II region. Managing complete Telco and Non-Telco Scope of work on 1300+ Sites

• Nationwide COW (Cells on wheels) Movements, Installation contract with Telenor Pakistan via ZTE Pakistan

• Ufone Pakistan: HRM project: Via Huawei Pakistan for South-II & III region. The BTS sites count for this project is 1350+ sites.

• JAZZ: HRM project: Via Huawei Pakistan for South-III & IV region. The BTS sites count for this project is 450+ sites.

• CMPAK DWDM HRM project: Via Huawei Pakistan for South-II & III region. The sites count for this project is 44+ sites

• CMPAK USF project; Via Huawei Pakistan for Turbat, Gawadar, Pajgur region. The BTS site count is 52 sites.

• CMPAK USF Solar Project; Via Huawei for Turbat, Gawadar, Pajgur region

• Ufone Battery swap project: Via Huawei Pakistan for South-II and South III region. The site count for this project is 140+ sites.

• Pakistan Ordinance Factory turnkey supply for Armoured Trucks for 10Million USD.

• Model safe city Project Bahria Town Rawalpindi Phase 1 to 8. Supply and installation of CCTV cameras with complete back haul on turnkey basis.

• Turnkey projects for Complete HVAC systems for Bahria Town golf City, Weatherford Pakistan and Amanah Mall Lahore.

• Turnkey Project of Complete HVAC system for Fortune Mall Islamabad.

• Jazz Pakistan Managed Services Project for over 2300+ sites for Central-II, South-III and South-V Region; managing complete Telco and Non-Telco SOW.

• Edotco Pakistan Managed Services Project for 11 Sites in Quetta, Kharan, Hyderabad and Sukhar cities.

EES Past experience in Managed Services:

• Maintained Ufone BTS, Msc, Offices, Call Centers & Core via Huawei for 2.5 years i.e. 2011-13:

  • 4000 BTS Sites (Complete Central)
  • 47 Offices (Including Call Centers)
  • 13 MSCs

• Maintained Telenor BTS & Core via NSN, Huawei, Direct TP & ZTE from 2005-Present:

  • 2100 BTS Sites (Complete Central)
  • 31 MSCs

• Maintained Mobilink BTS in South via Alcatel Lucent in 2012-13:

  • 640 BTS Sites (Karachi City)

• Maintained Mobilink via Mobiserve in 2010-11:

  • 450 BTS Sites (Central-II)

• PTCL OFAN AC Maintenance Nationwide project in 2009-10:

  • 2000 BTS, Hub, BScs and MSCs Sites.

• Maintained IT/ Data Back-up server Project Nationwide for Warid, PTCL, Ufone, and Mobilink via Huawei in 2011-12.

• Overhauled 1000+ DG’s nationwide with capacity of 9 KVA- 1.2 MW

EES Experience in Rollout, Swap & other services:

• Telenor Pakistan Civil Roll out 300+ sites 2004-07.

• DG Overhauling of 150+ DG sets for TP in 2012.

• Telenor Pakistan SWAP through ZTE & Huawei: 310 Sites in 2012-13.

• CM Pak SWAP through Huawei: 250+ Sites in 2012.

• CM Pak Expansion through ZTE: 150+ sites in 2012-13

• Telenor GS-Yuasa Power SWAP Project: 450 Sites in Karachi, Hyderabad & Baluchistan Region in 2013.

• Telenor 3G Expansion: 250+ Sites in S1, S2 Region (This is mainly S4 Region of Ericsson) in 2014. Quota of more than 200+ sites already assigned for 2015 1st two quarters.

• COW Sites Movement, Installations for Telenor Pakistan: 07 Sites in Karachi & 08 Sites in Interior Sindh in 2014 and 2015 quota already assigned by ZTE Nationwide which includes above 15 sites in south.

• Mobilink Pakistan SWAP through Huawei for more than 500+ sites in 2011-13.

• Signed Agreement for Mobilink SWAP through ZTE for 100+ sites for 2015.

• Ufone Swap Phase 7.2B Project 100 Sites.

• Mobilink Swap Phase II Project 50 Sites.

• Mobilink SWAP Phase III 100 Sites.

• Mobilink Swap Phase IV Project 160 Sites

• Ufone Project BTS/BSC/M2000 Installation /Expansion

• CMPAK MW SWAP Project Central Region 100 Links

• CMPAK BTS SWAP Project 152 Sites TSSR Surveys

Optical Fiber related Projects

• Network Survey, Engineering, Planning, Designing of OFC on below:

• 800KM of OFAN Phase-II project with Huawei for PTCL.

• 130KM of LAFCO project which also included drum testing of OFC.

• 5400KM of largest Long Haul Network across Pakistan completed in 14 months.

• 310KM on turnkey basis of Metro projects.

• 300KM of Metro extension in Karachi, Lahore and Islamabad.

• Managed services of Long Haul Optical transmission network project of approximately 5500KM for 04 Years.

• Supply, laying, jointing, testing and commissioning of Access Rings of MSAG project in South for PTCL.

• ODN Survey, design and technical supervision of 5K GPON FTTH project of PTCL.

• GPON/ FTTH structured cabling system installation in Islamabad, Lahore and Karachi.

• ODN Survey, design and technical supervision of 3K GPON FTTH project of PTCL.

• OFC supply and service of Safe City-S1 Project in Islamabad for Huawei.

Recent Project for MEP Division

• M/S Memon Medical Institute (EES/OES/PRIME)

• M/S Memon Medical Institute (EES/OES/PRIME)

• M/S Hanifia Suleman Dawood Oncology Center (EES/OES/PRIME)

• Saima Pari Shopping Mall (EES/OES/PRIME)

• Zafa Pharmaceutical Laboratories Pvt. Ltd. (EES/OES/PRIME)

• M/S Sante Pharmaceuticals Pvt. Ltd. (EES/OES/PRIME)

• M/S Bosch Pharmaceuticals Pvt. Ltd. (EES/OES/PRIME)

• M/S Bosch Pharmaceuticals Pvt. Ltd. (EES/OES/PRIME)

• DHA Creek Lodges(EES/OES/PRIME)

• Auditorium IBA Main Campus (EES/OES/PRIME)

• Karachi University (EES/OES/PRIME)

• IBM (EES/OES/PRIME)

• DUTECHE BANK(EES/OES/PRIME)

• STANDARD CHARTED (EES/OES/PRIME)

• KFC(EES/OES/PRIME)

• DUNKIN DONUTS(EES/OES/PRIME)

• DOLMEN CITY(EES/OES/PRIME)

• KIDNEY CENTER(EES/OES/PRIME)

• PAKISTAN INTERNATIONAL CONTAINER CENTER(EES/OES/PRIME)

• P&G(EES/OES/PRIME)

• MICROSOFT(EES/OES/PRIME)

Global Project-Outside Pakistan:

Uzbekistan Projects

  • BTS Site construction for Bartec – NSN/UCELL Project (200 Sites)
  • Telecom equipment complete installation BTS site for Bartec – NSN/UCELL Project (200 Sites)
  • BTS SWAP – Dual Band Revision for Bartec – NSN/UCELL Project (100 Sites)
  • MSC/BSC Core sites dismantling and installation – NSN/UCELL Project
  • MSC/BSC Core Power Installation Project – NSN/Ucell
  • MGW Installation Project – NSN/Ucell
  • HiT Installation Project – NSN/Ucell
  • LOS For BTS Sites ZTE/Ucell

Afghanistan Projects

  • Optimization and network auditing for Roshan Telecom
  • Operating Pay phones for Roshan Telecom all over Afghanistan
  • BTS Roll Out throughout Afghanistan for Roshan Telecom
  • Supply of Mobile Phone Hand sets and accessories throughout Afghanistan through Rabita’s distribution network, approx. 7600 distribution points

Maldives Projects

  • Network Auditing and business planning consulting for Wataniya – Qatar Telecom (QTEL)
  • Supply of Handsets and fixed wireless terminals to Wataniya
  • Supply of BTS allied passive equipment

Optical Fiber Projects in Saudi Arab & Africa

  • Survey and planning of FTTH project of Motorola/ Verizon USA for 09 districts of Jeddah, Riyadh and Dammam in Saudi Arab.
  • OSP Supervision for OFC laying for Huawei in Uganda for Ministry of ICT E-Government Africa.
  • Provision of Technical Audit Teams for the execution of OFC E-Government project of Rwanda for Huawei.
  • OSP Supervision for OFC for Huawei/ MTN in Rwanda, Africa.
  • Provision of Technical Audit Teams for the execution of OFC for UTel Project of Angola for Huawei.

MAJOR CUSTOMERS

  • Ufone

  • Telenor

  • Huawei

  • Mobilink

  • China Mobile

  • PTCL

  • Nokia Siemens

  • Mobiserve

  • U Cell

  • Roshan

  • Wataniya

  • ZTE

  • PSO

  • National Bank

  • Wi-Tribe

  • Wateen

  • Link Dot Net

  • Bahria Town

  • Askari Welfare Trust